We Energies service replacement work is scheduled to begin sometime this week or next week. Motorists should expect:
• A one-day closure of Berlin St. between Park Ave. and Demarest Ave.
• A lane shift from Shadow Woods Ln. to Lake St.
• Temporary sidewalk panel removals in work areas.
These measures are needed to locate shallow water mains before construction proceeds. Please see the attached traffic control plan and use caution when traveling through the area. Thank you!
